MBDA: Laboratory Refurbishment, Bristol
Client: MBDA Missile Systems
MBDA Missile Systems - The only integrated defence company to provide missiles and missile systems for each branch of the armed forces (air, sea, land).
Location:
Filton, Bristol
Duration
21 weeks over two phases
Constructed
2022
The brief:
Sweet Projects for this project carried out the removal of the walls, reconfiguring electrical systems, installing new air conditioning units, new doors, and soft flooring to modernise the interior, improve air quality, and providing a better working environment.
Additionally, ESD flooring was installed in certain areas to protect sensitive equipment. The project also included upgrading walls, installing a new drop curb, and bifold doors for better accessibility, followed by fully decorated areas as agreed, to complete the transformation.
The project was a success, providing a more efficient and comfortable work environment for employees. Improvements such as air conditioning and ESD flooring increased functionality and safety, while new doors and drop curb enhanced accessibility.
Key challenges:
- Working in live environment
- Top level security clearance was required
- Challenging refurbishment
- Amendments to existing staff access
- Delivery and storage restrictions
The solutions:
- Full Category B Design & Refurbishment of technical offices & laboratories
- Close working with the client team to identify & maintain services to existing building
- Improved access for large, bulky deliveries into the building