Sweet Projects was commissioned to revisit and reprofile the existing concrete ramp into the warehouse, plus fully refurbish the existing offices, kitchen/toilet areas with associated mechanical & electric services.
These works consisted of the removal of existing internal walls and partitioning, reconfiguring existing electrical installation systems, and incorporating new ones where necessary.
The work involved the refurbishment of Building 07Ns welfare facilities, which involves numerous toilet, kitchen, and shower areas on all levels of the building.
The building consists of eight floors including a basement and lower ground floor. BAE Systems occupy three floors.
Sweet Projects was commissioned to provide a full Category B design and refurbishment of BAE Systems Submarines’ main Bristol offices 2800m2 second floor.
Design and construction for refurbishment of complete 2nd floor and zone D of 1st floor to create a dynamic office space. Works to 3rd floor plantroom M&E systems to compliment refurbishment.